We can provide a level of management and technical integration that is best-in-class. 6. Thank you for submitting this Sale Inquiries form. How your organization can meet Canadian accessibility standards. 2 illustrates the second assembly member 50 as comprising elements having the same element reference numbers. A Pay-on-Foot (POF) parking system is often used interchangeably with other terms, such as "gated parking" or "parking access and revenue control system (PARCS)." Shanghai Range International Enterprise Co., Ltd. Servo Motor waterproof IP54 6meter arm 3.5S remote control road security automatic price parking boom, High Speed 3S Highway Vehicle Access Control Parking Retractable. If you are a member of an airport parking authority involved in parking management, you have come to the right place. Mobile Gate combines ticket dispenser and POS in one device and thus It is desired that the breakable member be formed from a material that is both capable of supporting the weight load of the gate arm without breaking, but breaking when exposed to a sufficient horizontal force imposed by a vehicle impacting the gate arm. In an example embodiment, the breakable member 38 is formed from fiberglass-reinforced composite. Precise ParkLink is proud to announce that we have been awarded as managed parking service and technology provider for Georgian Bay General Hospital. The breakaway assembly as recited in claim 9 further comprising means for securing each breakable member portion within respective slots to prevent lateral wobble. Real-time events, alarms and defined thresholds, Mappable statistics with colour-coded indicators, Warranty and parts exchange programs, post-warranty programs. The breakable member is constructed so that it preferentially breaks between the first and second assembly members in response to a determined impact force imposed on the gate arm to spare the gate arm from serious damage, to ease and expedite repair operations, and to reduce the costs associated with maintaining and adequate inventory of replacement parts. Special focus on the use of energy-saving components. The breakable member 38 is interposed within the slot 40 of the second assembly member 50 so that it extends between both first and second assembly members 20 and 50. door opener,garage door opener,rolling shutter motor,car parking. 14. | Country Search In most cases, the device operator does not have a replacement new gate arm or adequate repair materials in their immediate inventory due to the cost associated with such an undertaking. Accordingly, FIG. Suitable for every budget the column offers comprehensive In an example embodiment, such means is in the form of holes 42 that extend through the first assembly member 20 and slot 40, and pins 44 that are disposed through the holes 42. During this period of time the device is unable to serve as a vehicle barrier, thereby allowing vehicle to pass freely through the otherwise controlled area. CANADAS PARKING INDUSTRY LEADER FOR MORE THAN 30 YEARS. column is already integrated into the barrier. Quick Movements, Longer Booms Boom lengths up to 4,5 meters (14,76 ft) in one single variation of the basic device with optional magnetic lock to prevent misuse. It is desired that the arm base 24 include a complementary cut out portion 30 and shoulder 32 to ensure that the arm base fits securely against the first member first end 22, and to ensure that profile of the arm base complement and blend with the first member. A breakable member 38 constructed in this manner will provide a controlled break, when the gate arm is subjected to an impact force, along the indentation. -, All SKIDATA catalogs and technical brochures. gate barriers suppliers repair services ae Position yourself as a leader in sustainability and decide Shenzhen Tiancheng Zhitong Technology Co., Ltd. Shenzhen Zhendi Intelligent Technology Co., Ltd. Shenzhen Wejoin Machinery & Electrical Technology Co., Ltd. Shenzhen Wanqiaohong Technology Co., Ltd. Fujian Omker Intelligent Technology Co., Ltd. High quality safety equipment new products industrial, 10 Million Cycle DC Servo Torque Motor Boom. But what sets us apart from other parking operators isnt where we are, its what we are: a full-service parking solutions provider. SHOP | E-Service Requests | Service Pro | Parkfolio | Marketing Portal. Operation in a wide range of temperatures possible without any extra heating or ventilation. modern and diverse ticket Barrier.Gate Smart -The intelligent parking system without a column The Barrier.Gate Smart is an intelligent system in which the function of a parking column is already integrated into the barrier. Since then, Precise ParkLink has grown into a nation-wide managed services and technology firm with more than 700 employees across Canada, a head office in Toronto, and 13 supporting offices across the country. 8. gate barriers suppliers repair services ae Shenzhen Yuan Mechanical Electronic Co., Ltd. 304 stainless steel Automatic Crowd Control Swing, Automatic Crowd Control Swing Barrier Gate, Parking System Automatic Gate Barrier Gate, RFID plaza electric parking lot single arm boom. The set screw 48 is turned within the threaded hole 46 to engage an adjacent surface of the breakable member 38 within the slot 40 and thereby secure the breakable member therein to minimize or eliminate lateral space between the slot and breakable member. Accordingly, the member 56 includes an electrical connection 60, extending therefrom and away from the breakaway assembly 12, that is connected to a desired indication means (not shown). the entire charging procedure of an electric car in your garage. Shenzhen Sunfre Intelligent Technology Co., Ltd. Chisung Intelligence Technology (Shenzhen) Co., Limited, Chisung Factory Wholesale Yards Lifting Auto Straight Boom, Flexible Retractable Expandable Folding Sliding, factory special offer portable aluminum barricades. Delivering premium parking management and technology integration. The first assembly member has a slot 40 that is approximately 4 centimeters deep and that is approximately 7 millimeters thick. In an example embodiment, for use in a particular application, the middle portion of the breakable member 38 is exposed between the slots of each assembly member for a length of approximately 11/2 centimeters. Display of various symbols via the integrated track light. 1-click quotation comparison We choose to supply and support Skidata technology because they are a market leader in providing corporate longevity, product reliability, technological architecture, and leading market products. The breakaway assembly comprises a first assembly member that is adapted to be connected at one of its ends with a movable member of a vehicle barrier device, and a second assembly member that is adapted to be connected at one of its ends with a gate arm of the vehicle barrier device. Keytag.Gate is Heavy Duty Automatic Boom Barrier Gate Price. Precise ParkLink manages thousands of parking lots on behalf of hundreds of property owners. Copyrights 2022 Qudra-Tech Inc. All rights reserved. The Barrier.Gate Smart is an intelligent system in which the function of a parking RFID parking system,RFID parking reader,hand-free access control. Unique: Colored joint barrier boom using RGB LEDs for safety and recognisability. The pay station allows customers to pay-on-foot, while the entry and exit terminals may enable customers to pay-on-exit or pay-on-entry. For example, the first assembly member 20 can be configured having another cutout portion located at the second end 36. The breakaway assembly 12 is connected to the gate arm attachment means 16 at one of its ends, and is attached to a gate arm 18 at an opposite one of its ends. A representative will be happy to help you shortly. Alerts, alarms and defined thresholds are transmitted and displayed in real-time to IPARC our live central monitoring station. Difficulty submitting this form? In an example embodiment, the second end 36 includes a slot 40 that extends a distance towards the first end 22. fast and uncomplicated access to the parking facility. The advantage of gated parking systems over parking meters is access and revenue control. The Lite.Gate is the smart alternative for ticket reading only. QudraTech serves Governments, Educational institutions, Telecommunication operators, Retailers and Private Sector in the Middle East. Were online 24/7 monitoring the status of your gated parking system. Our gated parking technology is smart and connected to ParkSuite an all-in-one business intelligence and live central management platform providing you with full insight and control over your parking operation. gates, barricades ; Preventing passage of vehicles of selected category or dimensions, Arrangements for obstructing or restricting traffic, e.g. Thanks to mobile handheld The repair operation usually consists of replacing the gate arm with a new gate arm, however, can consist of bracing the broken portion of the existing gate aim. Precise ParkLink is proud to announce that we have been awarded as managed parking service and technology providers for Bathurst College Centre. The gate arm itself is typically made from a suitable rigid structural material such as wood and the like. The arm base 24 can be fabricated by any conventional material that is suitable for providing a secure attachment with the gate arm attachment means of the vehicle barrier device (see FIG. With the reduction to a single product, you benefit not only from lower acquisition costs but also in the longer term through markedly lower energy consumption and the saving of space. Please let us know what city and province you require services in so we can connect you with a specialist in your region. 1 is a perspective view of a vehicle control device comprising a gate arm having a breakaway assembly constructed in accordance with the practice of the present invention installed therein; FIG. a breakable member releasibly connected at one end to the first assembly member and releasibly connected at an opposite end to the second assembly member, wherein the breakable member is constructed to break between the first and second assembly members in response to a determined impact force imposed on the gate arm. Skidata Electric charging station Ampere.Gate. an actuating mechanism housing having an actuating member extending therefrom; a gate arm base connected to the actuating member; a breakaway assembly interposed between the gate arm base and a gate arm, the breakaway assembly comprising: a first assembly member attached at one of its ends to the gate arm base; a second assembly member attached at one of its ends to the gate arm; and. additional revenue. It is desired that the breakaway assembly 12 be connected to the vehicle barrier device 10 at a position that is close to the attachment means 16 so that a sufficient force will be imposed on the breakaway assembly 12 to cause it to break away when the gate arm is impacted by a passing vehicle, thereby saving the gate arm itself from serious damage. The gate arm is constructed in a complementary manner to provide a secure fit with the second member 50, and is fixedly attached thereto by nut and bolt attachment. Alibaba.com Site: International - Espaol - Portugus - Deutsch - Franais - Italiano - - P - - - - - Trk - Nederlands - ting Vit - Indonesian - , AliExpress 1999-2019 Alibaba.com. It is to be understood that the use of the slot is but one method of accommodating placement of the breakable member 38 within the first assembly member 20, and that other methods can be used and are intended to be within the scope of this invention. your rates for the charging independently from electricity providers. 2 from the first end 22, the first member 20 includes a cut out portion 26 that extends a distance there along and includes a shoulder 28 at a transition point from the cut out portion 26 to the remaining portion of the first member. The breakaway assembly as recited in claim 3 wherein the breakable member is releasibly connected within the slot of the first assembly member by pins extending through the second assembly member, the slot, and the breakable member. 4, the first and second attachment members 20 and 50 can be constructed to accommodate a rigid or flexible member 56 that is connected at opposite ends to conventional attachment means 58, such as screws and the like, that are used to connected the cable 54. The No barriers for you and your applications but a distinct boundary for your parking facility! Once the replacement gate arm is obtained, the replacement or repair operation is often time consuming and can require the assistance of more than one person. Suitable materials used for forming the breakable member include wood, plastic, and composites such as fiber-reinforced resin materials. Shenzhen Zento Traffic Equipment Co., Ltd. Moving from left to right in FIG. Referring back to FIG. It is desired that such lateral space be minimized or eliminated to prevent the breakable member from wobbling within the slot due to wind effects or the like, which could cause the breakable member to crack or break prematurely. Barrier.Gate No barriers for you and your applications but a distinct boundary for your parking facility! A breakaway assembly including a gate arm comprising: a first assembly member that is adapted to connect at one end to a gate arm operating mechanism, the first assembly member having a slot extending therein at an opposite end; a breakable member having a first end portion disposed within the slot; a second assembly member that is connected at one end to a arm, and that includes a slot extending therein at an opposite end, wherein the breakable member has a second end portion disposed within the slot of the second assembly member; wherein the first and second assembly members each comprise pins that extend therethrough, through respective slots, and through respective portions of the breakable member to provide a releasibly locking attachment therewith; wherein the breakable member is constructed to be preferentially broken in response to a determined impact force imposed onto the gate arm. The breakaway assembly 12, once installed into a gate arm in the manner described above, will brake at the breakable member 38 when the gate arm is subject to an impact of sufficient force. When Precise ParkLink was founded more than 30 years ago, the company was a two-person field operation with a simple aspiration: to make a difference in the world of parking automation. | gates, barricades ; Preventing passage of vehicles of selected category or dimensions movable to allow or prevent passage, Arrangements for obstructing or restricting traffic, e.g. This form is for business sale inquiries only. 2, if desired, the first assembly member 20 can include means for securing the breakable member 38 within the slot 40 that is independent of the releasibly locking means, e.g., the use of the holes and clevis pins. In a preferred embodiment, the first assembly member 20 includes a pair of holes 42 that are positioned vertically (with reference to FIG. For example, referring to FIG. The first member 20 has a rectangular geometric shape that is selected to complement the structure of the gate arm and arm base 24. Perfect, for example, for office or residential complex parking spaces in which the users all dimensions in mm alle Mae in mm Housing made from high-impact resistant plastic; support stand manufactured from eloxed aluminum Integrated drive gear motor with frequency converter control and slipping clutch Self-locking drive (stops motion in case of power failure) Barrier breakage detector Variable opening times, congurable in accordance with barrier arm length Barrier arms made from GRP Barrier arm lengths up to 4,5 m (14.76 ft) Barrier arms are easy to mount Versions for left-hand and right-hand trafc Barrier arms Standard: Color Trafc Yellow RAL *Prices are pre-tax. This can present both a security risk, in those applications where the device functions to permit the passage of only authorized vehicles into an otherwise secure area such as a gated community, and result in a loss of revenue, in those applications where the device functions to permit the passage of vehicles after a parking fee or toll is collected such as a parking lot or garage, or a highway toll booth. Terms of Use 1). No wait time, no dealing with inconvenient windows and tickets. | Extensive advertising possibilities generate markedly lower energy consumption and the saving of space. Free format text: -, All SKIDATA catalogs and technical brochures, Coder Basic Desktop & Coder Unlimited Desktop. additional revenue. Quick Movements, Longer Booms Boom lengths up to 4,5 meters (14,76 ft) in one single variation of the basic device with optional magnetic lock to prevent misuse. For example a higher brake rating would be desired in applications where the wind effects are high and/or the gate length is long, and a lower brake rating would be desired where the wind effects are low and/or the gate length is short. The breakaway assembly as recited in claim 1 further comprising means for providing a signal indicating that the breakable member has been broken. The use of high quality Because of variations which will be apparent to those skilled in the art, the present invention is not intended to be limited to the particular embodiments described above. | Alternatively, the operating mechanism for the device 10 can be one that is operated manually, i.e., without the use of an electric motor and the like, by action of the operator. In an example embodiment, the arm base 24 is formed from a polymer material such as polypropylene to facilitate attachment to the gate arm attachment means by clamp attachment. FIG. A breakaway assembly, constructed according to principles of this invention, is adapted for connection within a vehicle barrier device having a gate arm and includes a removable breakable member that is interposed between connected gate arm portions, and that is adapted to be preferentially broken when a sufficient impact force is imposed on the gate arm. Why accessible design is a top priority for leading parking equipment manufacturers and suppliers. Housing made from high-impact resistant plastic; support stand manufactured from anodized aluminum Integrated drive gear motor with frequency converter control and slipping clutch Self-locking drive (stops motion in case of power failure) Barrier breakage detector Variable opening times, configurable in accordance with barrier arm length Barrier arms made from GRP Barrier arm lengths up to 4,5 m (14,76 ft) Barrier arms are easy to mount Versions for left-hand and right-hand traffic Barrier arms Standard: Color: Traffic Yellow RAL 1023/translucent; nonilluminated for *Prices are pre-tax. The Intelligent System Without Column High-Quality, Energy-Optimized Components The inexpensive solution for your long-term parking facility: You only need the barrier gate, no column. A preferred material is aluminum due to its desirable combination of structural rigidity and strength and light weight. The Power.Gate offers comprehensive possibilities for the ticketing wherein the breakable member is constructed to break in response to a determined impact force imposed onto the gate arm. Hundreds of organizations across Canada utilize Precise ParkLinks Skidata parking technology. 1 illustrates a vehicle barrier device 10 that includes a breakaway assembly 12 of this invention. In an example embodiment, for use in a particular application, the breakable member 38 is approximately 9 centimeters long, 8 centimeters wide, and 6 millimeters thick. 4, the member 56 is disposed between the first and second attachment means so that it is affected upon the breaking of the breakable member. In an example application, it is desired that the breakable member break when a distance of 48 inches is reached. In an example embodiment, as illustrated in FIG. sector with the most The operating mechanism for the device 10 can be of conventional gear or belt-driven design that is adapted to cause the attachment means 16 to rotate in a clockwise direction to raise the gate arm, or a counter-clockwise direction to lower the gate arm, by electric motor operation that is either automatically actuated or actuated by operator input. Suitable materials for forming the first assembly member include metals and metal alloys. The breakaway assembly is designed so that an operator can repair it within a matter of minutes without having to use special tools, and without the need for assistance from others. OEM,ODM & multi-category buying. FIG. Ensuring your welcome experience is pleasant for everyone. The Intelligent System Without Column High-Quality, Energy-Optimized Components The inexpensive solution for your long-term parking facility: You only need the barrier gate, no column. In an example embodiment, the brake member is tested to determine its brake rating by dropping a 12 pound weight onto the gate arm at different distances from the breakaway assembly. The first assembly member 20 has a second end 36 that includes means for accommodating a breakable member 38 therein. Bi-directional video communication provides your company with a face. 3, the breakable member has an indentation 52 running vertically across each opposite surface along the middle of the breakable member. ParkSuite is an end-to-end parking management platform allowing you to manage your entire parking portfolio from one place. 3. Mobile.Gate can also High-quality design that is the best in its field. Certain Pay-on-Foot pay stations also accept coins and banknotes. The first truly accessible parking technology on the global market. Ultimately, the type of material selected will depend on the particular application and such factors as gate arm length, gate arm weight, gate arm size, and wind effects. The breakaway assembly as recited in claim 8 further comprising pins disposed through the first and second member, and through respective slots, to releasibly attach the respective breakable member portion therein. A few locations are: When exploring gated parking solutions, its critical to understand that they in no way can or should be compared to parking meter solutions. To facilitate a controlled breakage of the breakable member at a designated portion it may be desirable to provide an indentation or stress riser running vertically across one or each opposed surface at the middle of the breakable member. When this occurs, the device must be repaired in order to continue serving as a vehicle barrier. (keytag) that adhere to the vehicle's windshield for hands-free access. The Canadian Parking Association is taking its annual Conference and Trade Show online, ahead of COVID-19 health and safety regulations. Additionally, the breakaway assembly 12 can be designed to accommodate means for providing a signal for activating an audible or visual indication in the even that the breakable member becomes broken. materials ensures an easy installation and maintenance, and cost reduction during Small amount of components. The breakaway assembly as recited in claim 8 further comprising a member connected between first and second assembly members and adapted to provide a signal upon breaking of the breakable member. turnstile freemotion skidata tourniquet archiexpo tripode tornello turnstiles Constructed in this manner, the breakaway assembly is designed to be broken upon sufficient impact force imposed on the gate arm, thereby saving the gate arm from serious damage. 1; and. Large touch-screens with shift-screen functionality, A wide-variety of cashless payment acceptance including easy tap- and scan-payment options, Assistive listening systems for Audio Frequency Induction Loop (AFIL)-compatible hearing aids, Internationally consistent and high-contrast colour, character and symbol-use, glare-free surfaces, bright illumination levels, Vince QuattrociocchiVice President OperationsRead Metro Toronto Convention Centre Parking Case Study. gates, barricades ; Preventing passage of vehicles of selected category or dimensions movable to allow or prevent passage by swinging into open position about a vertical or horizontal axis parallel to the road direction, i.e. When you purchase our gated parking solutions, you will have access to: Submit the form below to inquire about our parking solutions. These and other features, aspects, and advantages of the present invention will be more fully understood when considered with respect to the following detailed description, appended claims, and accompanying drawings, wherein: FIG. Parking facilities can be Breakaway assembly for vehicle barrier device, data:image/svg+xml;base64,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, data:image/svg+xml;base64,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, CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES, ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE, Arrangements for obstructing or restricting traffic, e.g.

Sitemap 26